None

Recent failures

Failed In Fixed In Time Taken To Fix
#7 Code changes detected

#8 Code changes detected

1 build

6 minutes

#1 First build for this plan

#5 Code changes detected

4 builds

1 day, 1 hour, 32 minutes

  • Average time to fix a failure: 12 hours, 49 minutes
  • Average number of builds between fixes: 2.5 builds
  • The longest time taken to fix a failure is 1 day, 1 hour, 32 minutes, from failure starting in build #1.
  • The greatest number of builds taken to fix a failure is 4, from failure starting in build #1.